the-method-statement-king.co.uk
visit the websiteThe-method-statement-king is #5,277,795 website in United Kingdom. "What is a Method Statement and How do I Write One Free information."
Advertisements
5,277,795
46,499,038
World Rank
Domain | http://www.the-method-statement-king.co.uk |
Daily visits | 8 |
Daily pages views | 47 |
Estimated value | £303 * |
Income per visitor | £2.52 |
Incoming links | 0 |
Keyphrases |
---|
method statement, method statements, advice, free, template, information, guide, example, download |
Rank in Countries |
---|
Web Traffic
Statistics History 3 Months Average | ||
---|---|---|
World Rank | 46,499,038 | +2,566,747 |
Monthly Visitors | 210 | -5.52% |
Monthly Visitors Rank | 17,384,396 | +959,619 |
Monthly Pageviews | 1,410 | 7% |
Monthly Pageviews Rank | 20,401,198 | -1,428,084 |
Pageviews Per Visitor | 6.81 | - |
Context
Headlines for www.the-method-statement-king.co.uk | |
---|---|
Related Websites
the-met-office.co.uk the-met.co.uk the-metal-bridge-inn-carlisle.co.uk the-metal-works.co.uk freemethodstatement.co.uk hsdirect.co.uk hsdirect.com iwantchasnow.co.uk solutionhost.co.ukLinks
Outgoing Links | |
---|---|
hsdirect.co.uk | |
hsdirect.co.uk | |
hsdirect.co.uk | |
210 guests visit the website monthly, each of them views about 6.81 pages. |
Web Server
Data Center Information | |
---|---|
Dedipower Managed Hosting Limited AS24931 DediPower Managed Hosting Limited Reading England United Kingdom 51.4562, -0.9711 |
|
Web server load time is 0.17 seconds. |
Its nameservers are nsb.nic.uk (156.154.101.3), nsd.nic.uk (156.154.103.3), dns2.nic.uk (103.49.80.1), nsc.nic.uk (156.154.102.3), dns1.nic.uk (213.248.216.1), dns4.nic.uk (43.230.48.1), nsa.nic.uk (156.154.100.3), dns3.nic.uk (213.248.220.1). Its IP number is 89.151.92.6 | |
IP: | 89.151.92.6 |
Server type: | Apache/2.4.23 (cPanel) OpenSSL/1.0.1e-fips mod_bwlimited/1.4 |
Charset: | ISO-8859-1 |
PING www.the-method-statement-king.co.uk (89.151.92.6) The package size is 46 bytes. | |
---|---|
46 bytes for 89.151.92.6: seq_num=1 TTL=89 | 51.4 ms |
46 bytes for 89.151.92.6: seq_num=2 TTL=89 | 52.9 ms |
46 bytes for 89.151.92.6: seq_num=3 TTL=89 | 51.0 ms |
--- www.the-method-statement-king.co.uk ping results --- | |
4 queries proceeded, 4 packets received, 0 lost (0% loss) | |
An average ping to the server is 38.8 ms, and the page load time is 0.17 seconds. |
Web Server Configuration | |
---|---|
Cache Control: | no-store, no-cache, must-revalidate, post-check=0, pre-check=0 |
Content Length: | 9544 |
Content Type: | text/html |
Date: | Fri, 24 Mar 2017 13:23:09 GMT |
Expires: | Thu, 19 Nov 1981 08:52:00 GMT |
Pragma: | no-cache |
Web Server: | Apache/2.4.23 (cPanel) OpenSSL/1.0.1e-fips mod_bwlimited/1.4 |
Cookies: | + |
Vary: | + |
P3P: | - |
ETag: | - |
MD5 Content: | - |
Public Key Pins: | - |
The data is estimated*
Data modified: 30.04.2017 14:40:13
Advertisements